Course Content
Electronics Components Introduction
Detail study about Electronics Component Required for Electronics Product Manuafcturing
0/3
🏭 Electronics Manufacturing Process – Step-by-Step Overview
🏭 Electronics Manufacturing Process – Step-by-Step Overview
0/1
6.THT (Through-Hole Technology) Assembly Process
THT (Through-Hole Technology) Assembly
0/2
9. Functional Testing (FCT)
Functional Testing (FCT)
0/1
10.Repair and Rework Process
Repair and Rework Process
0/1
11. 🌡️ Environmental and Reliability Testing (if applicable)
🌡️ Environmental and Reliability Testing (if applicable)
0/2
12. 📦 Box Build / System Integration
📦 Box Build / System Integration
0/1
13.🔗 Traceability in Electronics Manufacturing
🔗 Traceability in Electronics Manufacturing
0/1
14.Industry 4.0 in Electronics manufacturing
Industry 4.0 in Electronics manufacturing
0/1
15. 🏷️ Packaging and Labeling
🏷️ Packaging and Labeling
0/1
16.✅ Key Principles of ESD Compliance
✅ Key Principles of ESD Compliance
0/1
17. 📦 Finished Goods (FG) Handling and Delivery
📦 Finished Goods (FG) Handling and Delivery
0/1
Professional in Electronics Manufacturing -SMT Process
About Lesson

🔧 SMT PCB Assembly Rework – Overview

SMT Rework is the corrective process of removing and replacing defective, misaligned, or damaged surface-mount components on a PCB without damaging the board or adjacent parts. Rework ensures product reliability, reduces waste, and supports high-quality manufacturing standards.

Common reasons for SMT rework:

  • Misaligned components

  • Tombstoning or shifting

  • Insufficient or excessive solder

  • Defective components

  • Bridging or short circuits

  • Wrong part placement

Rework is performed using specialized tools like hot air rework stations, soldering irons, preheaters, tweezers, microscopes, and inspection systems.


🔟 10 Detailed Steps in the SMT PCB Assembly Rework Process


1. Defect Identification and Evaluation

Description:
Start by identifying the defective or non-compliant component using:

  • AOI, X-Ray, or functional test reports

  • Visual inspection under magnification

  • Reference to assembly drawing or BOM


2. Rework Planning and Authorization

Description:
The issue is logged into the Quality Management System (QMS). Rework is approved based on:

  • Severity of defect

  • Board value and rework cost

  • Customer approval (if required)

Documentation includes:

  • Rework ID

  • Fault type

  • Operator and inspector details

  • Acceptance criteria


3. Preparation and ESD Safety

Description:
Before beginning rework:

  • Ensure ESD-safe environment (grounded mats, wrist straps)

  • Clean the rework area

  • Load the correct soldering tips, tweezers, and hot air nozzles

  • Review component orientation and polarity


4. Component Removal

Description:
Using a hot air rework station or infrared heater:

  • Preheat the area to avoid thermal shock

  • Apply hot air uniformly to melt solder

  • Gently lift the component using tweezers or vacuum pen

  • Avoid lifting pads or traces


5. Pad and Site Cleaning

Description:
After component removal:

  • Remove residual solder using solder wick and flux

  • Clean the pads using isopropyl alcohol (IPA)

  • Inspect for pad damage or lifted traces

  • If damaged, determine repair method (copper foil, jumper wire)


6. Apply Fresh Solder Paste or Flux

Description:
Depending on the component type:

  • Apply solder paste using a mini stencil or syringe

  • Alternatively, use flux and feed solder during reflow

  • Ensure solder volume is adequate and cleanly applied


7. Component Placement

Description:
Place the correct replacement component:

  • Align according to polarity markings and pin 1 indicators

  • Use precision tweezers or pick-and-place pen

  • Confirm alignment under magnification


8. Reflow or Hand Soldering

Description:
Depending on component type:

  • Use hot air gun or infrared heater to reflow solder

  • For small passive parts, use fine-tipped soldering iron

  • Observe solder wetting and fillet formation


9. Post-Rework Cleaning

Description:

  • Clean flux residues using IPA and ESD-safe brushes

  • Dry the board completely

  • Inspect the area for any solder bridges, tombstoning, or cold joints


10. Inspection and Final Verification

Description:

  • Inspect reworked joint using microscope or AOI

  • Perform X-ray inspection for BGA/QFN

  • Run functional tests if required

  • Log rework completion and mark board status (pass/rework/fail)


10 “How To” Questions for SMT PCB Rework


1. How to Safely Remove a SMD Component Without Damaging Pads?

  • Use a controlled hot air rework station

  • Preheat the board gradually

  • Avoid forceful lifting – wait until solder is fully molten

  • Use low-adhesion tweezers or vacuum pickup tools


2. How to Identify Whether a Joint Needs Rework?

  • Use AOI or X-ray imaging

  • Look for insufficient solder, bridging, opens, misalignment

  • Compare joints with IPC-A-610 standards

  • Check for functional failure or erratic behavior


3. How to Rework a BGA Component?

  • Use infrared BGA rework station with precise profiling

  • Align BGA using camera-assisted vision system

  • Apply paste using mini stencil or preform

  • Perform X-ray after rework to verify ball integrity and voids


4. How to Clean Pads after Component Removal?

  • Use solder wick and flux to absorb old solder

  • Use IPA and lint-free swabs for final cleaning

  • Avoid excessive scrubbing – it may damage pad or mask


5. How to Replace a Misaligned Passive Component (0402/0603)?

  • Apply flux and remove using hot tweezers or soldering iron

  • Reapply paste or flux

  • Place and reflow or solder with fine tip

  • Inspect with 20x magnification


6. How to Repair a Lifted Pad or Trace?

  • Use epoxy repair kits or jumper wires

  • Re-anchor the pad if possible, or bridge to the next via

  • Apply conformal coating if needed

  • Update documentation with rework record


7. How to Apply Solder Paste for Rework?

  • Use micro syringe, mini stencil, or manual dispensing

  • Ensure no overflow onto adjacent pads

  • Use no-clean or low-residue paste when possible


8. How to Handle and Replace ESD Sensitive Components During Rework?

  • Use ESD gloves, grounded mats, ionizers

  • Handle components by the edges only

  • Store replacement components in ESD-safe containers


9. How to Verify the Quality of Reworked Joints?

  • Visually inspect solder joints with 10x–20x magnification

  • Ensure good wetting, shape, and shine

  • For BGAs, use X-ray to confirm ball integrity

  • Run continuity or power-on test


10. How to Record and Trace Rework Activities for Quality Control?

  • Use rework form or MES system to:

    • Record date, operator, part ID, defect type

    • Include before/after pictures

    • Mark rework on the assembly sheet

  • Review logs during quality audits

Scroll to Top