Course Content
Electronics Components Introduction
Detail study about Electronics Component Required for Electronics Product Manuafcturing
0/3
๐Ÿญ Electronics Manufacturing Process โ€“ Step-by-Step Overview
๐Ÿญ Electronics Manufacturing Process โ€“ Step-by-Step Overview
0/1
6.THT (Through-Hole Technology) Assembly Process
THT (Through-Hole Technology) Assembly
0/2
9. Functional Testing (FCT)
Functional Testing (FCT)
0/1
10.Repair and Rework Process
Repair and Rework Process
0/1
11. ๐ŸŒก๏ธ Environmental and Reliability Testing (if applicable)
๐ŸŒก๏ธ Environmental and Reliability Testing (if applicable)
0/2
12. ๐Ÿ“ฆ Box Build / System Integration
๐Ÿ“ฆ Box Build / System Integration
0/1
13.๐Ÿ”— Traceability in Electronics Manufacturing
๐Ÿ”— Traceability in Electronics Manufacturing
0/1
14.Industry 4.0 in Electronics manufacturing
Industry 4.0 in Electronics manufacturing
0/1
15. ๐Ÿท๏ธ Packaging and Labeling
๐Ÿท๏ธ Packaging and Labeling
0/1
16.โœ… Key Principles of ESD Compliance
โœ… Key Principles of ESD Compliance
0/1
17. ๐Ÿ“ฆ Finished Goods (FG) Handling and Delivery
๐Ÿ“ฆ Finished Goods (FG) Handling and Delivery
0/1
Professional in Electronics Manufacturing -SMT Process
About Lesson

โœ… 12.1 Planning and BOM Review

Objective: Ensure complete clarity of materials, processes, and design intent before starting the build.

Actions:

  • Review the Bill of Materials (BOM) including PCBs, enclosures, cables, connectors, fasteners, labels, etc.

  • Cross-check assembly drawings, 3D models, and circuit diagrams.

  • Plan tools, fixtures, ESD-safe areas, and required labor skills.

Deliverables:
โœ”๏ธ Approved BOM
โœ”๏ธ Work Instructions
โœ”๏ธ Production Plan


๐Ÿ”ง 2. Sub-Assembly Preparation

Objective: Prepare all modules or parts before final assembly.

Sub-assemblies include:

  • PCBA (already tested and programmed)

  • Cable and wire harnesses

  • Fan modules, power supplies

  • Switches, displays, and external connectors

Processes:

  • Visual inspection of PCBA

  • Pre-routing cables

  • Crimping, stripping, tinning wires


๐Ÿ—๏ธ 3. Mechanical Assembly (Enclosure Setup)

Objective: Install mechanical parts and prepare the enclosure.

Steps:

  • Assemble base chassis, mounting brackets, heat sinks

  • Install standoffs, shielding, or grounding mechanisms

  • Use anti-vibration pads or gaskets if required

  • Apply thermal pads or paste where needed (e.g., under power components)


๐Ÿงฉ 4. PCBA Mounting into Enclosure

Objective: Secure the tested PCB into the product housing.

Steps:

  • Align PCBA with mounting holes and I/O cutouts

  • Screw or clip the board in place using torque-controlled tools

  • Use spacers or insulating pads if specified

  • Maintain ESD safety throughout


๐Ÿ”Œ 5. Cable & Connector Assembly

Objective: Connect all internal interfaces between PCBA and subsystems.

Steps:

  • Connect:

    • Power cables

    • Signal cables (USB, HDMI, SATA, etc.)

    • Sensor wiring

  • Use zip ties, cable clamps, routing channels to organize

  • Ensure strain relief and insulation

  • Label cables per wire harness chart if applicable


๐Ÿ’ฝ 6. Firmware Installation / Software Loading

Objective: Load firmware or operating system into onboard memory/storage.

Methods:

  • Use USB, JTAG, or programming interface

  • Apply product-specific config files

  • Use batch loading tools for efficiency

  • Validate software checksum/version


โš™๏ธ 7. Functional Testing / System Testing

Objective: Verify the full operation of the integrated product.

Tests Include:

  • Power-on self-test (POST)

  • Input/output port check

  • Display or LED behavior

  • Connectivity tests (Wi-Fi, Bluetooth, Ethernet)

  • Touchscreen or button response

  • Audio/video testing

  • Software or UI boot-up

Tools:

  • Test jigs, diagnostic software, oscilloscopes, network analyzers


๐Ÿงช 8. Burn-In Testing (Optional)

Objective: Stress the unit to detect early-life failures.

Conditions:

  • Operate unit at elevated temperature (e.g., 45โ€“70ยฐC)

  • Run for 24โ€“72 hours with cycling loads

  • Monitor for abnormal behavior

Typically used for: Medical, automotive, aerospace, and industrial products.


๐Ÿงผ 9. Final Visual Inspection & Cleaning

Objective: Ensure product is clean, defect-free, and cosmetically acceptable.

Actions:

  • Wipe off fingerprints, dust, flux residues

  • Check for scratches, loose screws, gaps, or misalignment

  • Inspect labeling, markings, LEDs


๐Ÿท๏ธ 10. Labeling and Serialization

Objective: Apply unique ID for traceability.

Types of Labels:

  • Serial number labels

  • MAC address, model no., barcodes

  • Regulatory markings (CE, FCC, RoHS)

  • QR code for field servicing or warranty


๐Ÿ“ฆ 11. Final Assembly (Top Cover, Screws, Seals)

Objective: Close the enclosure and secure all parts.

Steps:

  • Install top cover or panel

  • Tighten all screws with correct torque

  • Apply tamper-evident or waterproof seals

  • Confirm fit and finish is consistent


Scroll to Top